Dust Control Will Occur Over Coming Weeks

Home / News / Dust Control Will Occur Over Coming Weeks
Back to News

Re-size text:

A
A
A

Dust Control Will Occur Over Coming Weeks

HIGH RIVER, AB:  Dust control measures will be undertaken over the next few weeks on select back alleys and roads in town. The surfaces will be graded and then a contractor will come in to apply a dust control product. The dust control application is a liquid wax product.
Residents are asked to avoid driving where the product for a few hours after it is applied to the alley or road surface.
Back alleys:
> Between 9th Avenue SE and 10th Avenue SE, from 6th Street SE to 8th Street SE
> Between High Country Drive NW and High Circle NW
> Between 2nd Avenue SE and 3rd Avenue SE, from Sunshine Trail SE to 20th Street SE
Roads:
> 2nd Avenue SE
> 20 St SE/NE
The work will be done as weather permits. Signs will be put in place to let residents know when work is scheduled in their area.
-30-
For more information please contact:
Peter Leek – Roads, Solid Waste & Recycling Supervisor
Town of High River Operations
403-652-4657
operations@highriver.ca
Share this news: