Northwest Pedestrian Bridge Final Report 2022-07-29
The final report and appendices provide results of the feasibility study looking at two options; cost estimates, environmental review and flood model results
Following an initial study in 2019, the Town conducted a resident survey in March 2022 followed by a more detailed feasibility study of the bridge, completed in July 2022. The links below provide the full report, separated into sections for web viewing.
Document 1 - Reports (PDF 3.0 MB; 66 pages).
Included in this document:
- 2022-07-29 High River NW Ped and Bike Bridge FINAL
- Appendix C - What We Heard Report (Resident Survey and feedback)
- Appendix E - RJC Conceptual Design Report
Document 2 - Cost Estimates (PDF 516 KB; 4 pages)
Included in this document:
- Appendix F - Cost Estimates
- Option 1 Estimate
- Option 2 Estimate
Additional Appendices
- Appendix A - Historical Resources Overview (PDF 73 MB - optimized for web; 350 pages)
- Appendix B - Environmental Desktop Assessment (PDF 5.1 MB; 20 pages)
- Appendix D - Flood Model Results (PDF - 5.3 MB - optimized for web; 3 pages)
These files contain detailed figures and images. They are reduced and optimized for faster web view. If you cannot open any of the files above, please contact the Town's Customer Service Representatives at 403-652-2110 to obtain a copy.
For more information:
Town of High River
403-652-2110
Bridge Locations Options
We're here to help, contact us!
309B Macleod Trail S.W., High River, Alberta
Monday to Friday 8:30am - 4:30pm (Closed on statutory holidays)
legislativeservices@highriver.ca
403-652-2110
Media Requests: communications@highriver.ca
Maps
Report a Concern